Construction crews at the Warsaw Library broke the new water main that was installed last week. The break, which occurred around 9 a.m. today, caused the library to be without water until repairs were made. According to Joe Dock, United Water manager, the water was expected to be turned back on by noon. No water damage inside the library was reported this morning. Photo by Gary Nieter, Times-Union[[In-content Ad]]
Construction crews at the Warsaw Library broke the new water main that was installed last week. The break, which occurred around 9 a.m. today, caused the library to be without water until repairs were made. According to Joe Dock, United Water manager, the water was expected to be turned back on by noon. No water damage inside the library was reported this morning. Photo by Gary Nieter, Times-Union[[In-content Ad]]