As required by 327-IAC-5-6-5(5), the Indiana Department of Transportation hereby gives notice of future construction activity falling under the NPDES stormwater general permit rule covering construction, 327 IAC 15-5. This project includes US 30 Minor Structural Overlay and US 30 Bridge Replacements over Danner Ditch, Robinson Ditch, and Pole Run Ditch in Kosciusko County. Estimated construction time is from April 2021 until November 2022. Receiving Waters: Danner Ditch (Arm Number Two Ditch), Robinson Ditch, Pole Run Ditch. Des. Number: 1601012 (Lead), 1701396/97, 1701385/86, and 1701389/90.
12-17 hspaxlp