E-Edition
News
News
Coronavirus Coverage
Local
National
CDC Microsite
Public Occurences
Courts
Education
Leisure
Business
Agriculture
News Briefs
Corrections and Clarifications
Sports
Manchester University
Local Sports
Grace College
Lakeland Christian Academy
Manchester H.S.
Tippecanoe Valley
Triton
Warsaw
Wawasee
Whitko
Local Roundup
Obituaries
Opinion
News Views
Letters To The Editor
Kudos
Guest Columns
Lifestyles
Anniversaries
Weddings
Engagements
Births
Religion
Club News
Generations
Classifieds
Classified Display Ads
Public Notices
Legal Display
Public Notices
Forms
Anniversary
Birth
Birthday
Engagement
Wedding
Subscribe
Contact Us
About Us
Facebook
Twitter
Public Input Will Be Key To Shaping The Future Vision Of U.S. 30
Joe Thallemer
, Warsaw Mayor
Friday, October 1, 2021 1:00 AM
Last month, I wrote about the progress we have been making with the Indiana Department of Transportation (INDOT) to address safety concerns on U.S. 30. In today’s column, I would like to give a bit of an update on the options under consideration, as we prepare for the INDOT-sponsored Planning and Environmental Linkage Study (PEL), set to begin in the spring of 2022.
INDOT will make the final decisions on all corridor improvements with information gathered from the PEL. In addition to evaluating traffic safety data, environmental red flags, the local impact of proposed improvements, soil conditions and right of way analysis, the PEL study will also rely on significant public input to develop their final recommendations. INDOT will utilize public input data as an important component to formulate their final recommendations.
The city of Warsaw and Kosciusko County are currently in the process of reviewing freeway options with public and private stakeholders, considering emergency service response times, hospital ambulance access, school transportation routes and employer and commercial access along the routes. Draft drawings and diagrams of preliminary options for routes that either utilize the existing U.S. 30 route or bypass sections of the current route are being shared.
Traffic on U.S. 30 in Kosciusko County is all “at grade” (with the exception of the existing U.S. 30/State Road 15 interchange) which creates conflicts at all intersections that is aggravated by increasing traffic volumes.
Creating a freeway eliminates intersections, road cuts and all “at grade” access points. This is done in one of three ways.
The first is an overpass/interchange (grade separation) with full on/off ramps. The second is simply an overpass (grade separation) without on/off access. The third option is to close or eliminate access.
Preliminary designs utilizing the current route must take into consideration the INDOT requirements that limit the spacing of full interchanges. For example, we have an existing grade-separated full-service interchange at U.S. 30 and State Road 15. Because of both Anchorage Road and Silveus Crossing’s close proximity (less than 1 mile) to that interchange, a request for full service on/off interchange at either of those locations would likely not be approved by INDOT. Instead, they could both be improved with an overpass/underpass grade separation.
In addition, if the current on-route option is chosen, access to U.S. 30 would be reduced. Design of a network of new and existing frontage roads would be necessary as part of the plan to accommodate and maintain safe access to U.S. 30.
Also of note, U.S. 30 traffic analysis that shows during peak traffic times, almost 50% of current U.S. 30 traffic is local. If the current route is utilized, the proposed new interchanges and overpasses would significantly improve local traffic safety and flow in either direction across U.S. 30.
We will be sharing these options at a public meeting in November in preparation of the PEL study that will begin next spring. The study will allow INDOT and their consulting engineers to gather and analyze very complex amounts of data over the next two years and propose a solution.
Public input will be key to shaping the future vision of U.S. 30 in Kosciusko County.
Submit A Comment
Please fill out the form below to submit a comment.
*
indicates a required field
Comment
*
Your Name
Email
Phone
A comment must be approved by our staff before it will displayed on the website.
Submit
X
Content ©
2022
Warsaw Times-Union
Software © 2022
1up! Software
, All Rights Reserved
Back to Mobile Site
{1}
##LOC[OK]##
{1}
##LOC[OK]##
##LOC[Cancel]##
{1}
##LOC[OK]##
##LOC[Cancel]##
{1}
##LOC[OK]##
{1}
##LOC[OK]##
##LOC[Cancel]##
{1}
##LOC[OK]##
##LOC[Cancel]##